AI Use Cases: Planning

AI use cases for Planning: Capacity Modelling, Discovered Work Scope Assessment, Cross-Squad Dependency Detection.

Part of the AI Use Case Catalogue. Every entry names its owner, how much the agent may do alone, the human checkpoint and how the result is verified; the catalogue overview explains each field.

Full process: Sprint Planning in the Engineering Process, and the weekly queue review in Cadence Without Sprints for a founding team.

AI-008: Capacity Modelling

Purpose: Forecast how much the squad can finish from recent throughput, acceptance latency and the number of items with approved scenarios. With agents building, specifying and accepting are usually the slow steps.

Owner: Tech Lead

Autonomy: Drafts

Human checkpoint: The Tech Lead sets the commitment. The Devs and the QE say how much the squad can accept in the sprint: the Devs for their own changes, the QE for the always-reviewed list. Acceptance often sets the ceiling.

Verification: Each forecast sits beside the actuals of the last four to six sprints, and the next forecast shows how far the last one missed.

Context: Preparation before sprint planning. In a founding team the same numbers feed the WIP limits and the flow metrics at the weekly queue review.

Artefacts Required:

  • Throughput and acceptance latency for the last 4–6 sprints
  • Candidate items, with whether each has approved scenarios
  • Known capacity constraints for the coming sprint (holidays, on-call)

Artefacts Produced:

  • Recommended item count with a confidence range
  • The step most likely to bind: specifying, building or accepting

AI-009: Discovered Work Scope Assessment

Purpose: When a Dev flags “this is worse than expected”, run a spike on a throwaway branch and measure the extra scope from evidence, so the PM can make the trade-off within the day.

Owner: Dev (initiates); PM (decides)

Autonomy: Drafts

Human checkpoint: The PM decides between fixing now, deferring and working around. The discovered work becomes its own item (a subcard in a founding team) that waits for triage. Neither the Dev nor the agent folds it into the item in hand.

Verification: The estimate cites what the spike found: the files, the failing scenarios, the dependency that broke.

Context: Mid-sprint, when discovered work threatens the sprint commitment.

Artefacts Required:

  • The Dev’s description of what was discovered
  • Affected code area
  • Original item estimate and approach
  • Sprint remaining capacity

Artefacts Produced:

  • Scope assessment: additional effort, affected components, options (fix now vs defer vs workaround)
  • Trade-off summary for the PM
  • A new item for the discovered work, ready for triage

AI-010: Cross-Squad Dependency Detection

Purpose: Find committed items and live agent sessions in different squads that touch the same services, files or contracts, before the collision reaches main.

Owner: Staff Engineer

Autonomy: Drafts

Human checkpoint: The Staff Engineer decides which flagged conflicts are real and raises them with the Tech Leads involved.

Verification: Each conflict names the items, branches, files or contracts on both sides.

Context: At sprint planning, to catch conflicts in the commitments, and continuously during the sprint, when two squads’ agents start work in the same area.

Artefacts Required:

  • Committed sprint items across all squads, with technical approach notes where available
  • Codebase structure and service map
  • Active branches and agent sessions

Artefacts Produced:

  • Potential conflicts at service, file or API level
  • Severity for each conflict

← Refinement and Specification · All stages · Technical Design →